- Construction cost
- A lump-sum estimate of the three models from three or four contractors, on the performance specification. It is the check that decides the plan and it does not require the site to have been chosen.
- Market catchment
- Achievable residential price and a commercial catchment within twenty-five minutes. It matters more here than in an ordinary scheme, because the project lives on direct sale.
- Water and planning
- A flow test, a check of the constraints, and a prior discussion with the municipal authority on the holdings under review. They are the two tests that can stop the project.
- The site
- A holding of fifteen to twenty hectares close to a city, still to be identified. The water-abstraction permit is checked before buying, not after.
- Future growth
- 5.56 hectares of the holding remain reserved for later phases, without committing them today.
- Phase 2 · ECO CITY WORLD
- It opens only if Phase 1 works. Phase 2 is not a commitment made today. It starts only once Phase 1 has proved its results: homes placed, commercial catchment demonstrated, steady-state operation confirmed. The 5.56-hectare reserve that Phase 1 leaves free can host another 10–15 homes, an enlarged processing hub, a club house, a full restaurant, sports facilities, hospitality, a larger Academy and an agrivoltaic plant. Each function comes in once demand has been shown, not before.